Siemens On-stage PowerPoint-Template

21 ago. 2018 - Demand. Discharging. BESS. Charging. BESS. • The peak demand will be achieved by the asset. + the BESS an
1MB Größe 1 Downloads 39 Ansichten
El futuro de la Red basado en sistemas de almacenamiento de energía SIEMENS Andrés Eduardo Daboin 21 de agosto, 2018

© Siemens AG 2018 Page 1

January 2018

siemens.com/energy-management

EM MS - Future Grid

Inversores Granjas Solares

© Siemens AG 2018 Page 2

January 2018

siemens.com/energy-management

BESS Precios y Mercado

© Siemens AG 2018 Page 3

Nota: estos son precios de baterías, sin sistemas de electrónica de potencia. January 2018

siemens.com/energy-management

BESS: Sistemas de almacenamiento de energía en Baterías

Los sistemas BESS podrían dar una tasa de retorno de inversión mayor que las tecnologías tradicionales.

Generación

Transmision y distribución Comercio & Industria

© Siemens AG 2018 Page 4

January 2018

siemens.com/energy-management

SUNFLEX: BESS for PV Farms

SUNFLEX is the optimal BESS and PV inverter system in order to sale solar energy on not solar time. The SUNFLEX System could reduce between 5 to 7 % the DC/AC conversion losses, because SUNFLEX BESS is on the DC site and the energy will converter just one time from DC to AC.

Traditional AC BESS

Direct

Indirect

5 to 7% Reduction losses conversion DC/AC process No PV Inverter clipping

SUNFLEX

Mayor income per year

One AC conection assets

Less TR + Cable Capex

One BESS and PV inverter Supplier

Bankability.

STANDARDS AND CONFORMITY Inverter safety: UL1741 Lithium battery safety: UL1642 Battery module safety: UL1973 Power conversion harmonics: IEEE519 Interconnection of distributed resources: IEEE1547 © Siemens AG 2018 Page 5

January 2018

siemens.com/energy-management

SIESTART™: Optimized performance and new opportunities – for grid and ancillary services and turbine operation Power

Spinning Reserve

Frequency response PFR + SFR

Spinning Reserve: 3-7%additional income. GT max. load Blackstart: reduction capex and Diesel

Fast start, response within < 1s

Islanding , off-grid Fast start,

Black start

stress reduced

SIESTART system operation line Black start and support of grid restorage

Fast start-up

Primary frequency response

Fast rampup and ramp-down support

SIESTART GT operation line Secondary frequency response

Island load

Min. environmental load

Min Environmental load: reduction penalties. Time

Acceleration & stabilization of load ramps

Operating reserve for peak power

Frequency Response: directly payments from rules.

Minimum load

Fast Start, Ramp up& Down: reduction gas & maintenance time.

Islanding off-grid

In hybrid case the BESS could reduce up 15% of Gas, reduction operation time of genset up 55%

© Siemens AG 2018 Page 6

January 2018

siemens.com/energy-management

Peak Saving BESS for Assets

Discharging BESS Max Power of the Asset

• The peak demand will be achieved by the asset + the BESS and the BESS will be charged by the same asset on the valley time.

Charging BESS

• You shouldn’t increase the capacity or build a new asset if the demand peak will be in a few minutes of the year. Demand

24h

Asset Line

• T&D application need tariff payments rules, but not Industry sector, Industry sector need business case base on the saving.

• The best business case for BESS is when the demand have big peak in short time.

• Assets as transmission or distribution line, Generators and power transformers could be support by Peak saving BESS. © Siemens AG 2018 Page 7

January 2018

siemens.com/energy-management

BESS as MV UPS or Critical Power

Grid Supply (Feeder)

IncomerDistribution

LoadDistribution

 Reduction productions loss by no continues power supplier.

Bypass

Critical Load

3

3

3

 Ideal for high demand energy and critical power process as Steel producer, Mining, Oil & Gas Sector

3

 Design and integration on E-house by Siemens

W/O BESS

 Typical back-up time of 5-15 minutes; other backup times upon request IEC 62040-3: 2011 (DIN IEC 62040-3; VDE 0558-530: 2011)

 Can be used to deliver peak-shaving functionality as well for improved economics.

With © Siemens AG 2018 BESS Page 8

January 2018

siemens.com/energy-management

Ejemplo

Cliente

ENEL

Solution

Pais

• BESS (500 kW / 600 kWh)

Ventotene, Italy

Continuidad del servicio

Fecha

2016

• Controlador de Microgrid

• Integración con generadores de diesel existentes (480 kW cada uno) Customer benefits

• Ahorro en Diesel 15% Beneficios

• Reducción del 55% de horas de uso de los generadores • Reducción de emisiones de CO2

• Estabilidad de la red (voltaje y frecuencia) © Siemens AG 2018 Page 9

January 2018

siemens.com/energy-management

Contact

Andrés Eduardo Daboin Business Development Manager Energy Management Medium Voltage Solutions Mobil: +57.320.902.9627 E-mail: [email protected]

© Siemens AG 2018 Page 10

January 2018

siemens.com/energy-management

BESS Design and Concept

Ion Lithium Advantage for BESS

Energy Distribute by Bloque System

Charge or Discharge Disponibility

1

Convertidores DC/AC

2 to 4 time more Energy Capacity

2

conexión a la red

2

Filtro

Transformador auxiliar

Medida

High Eficency

3

Armario de control

Low AutoDischarge

4

~= ~= ~= ~=

1

~= ~= ~= ~=

~= ~= ~= ~= 4

Armario de baterías  Potencia: 90 kW  Energía: 45 kWh * Dependiente del proveedor

No Memory Effect o

o

Services Temperature 0 C to 40 C 3

* System Control Unit (unidad de control del sistema) ** Point of interconnection (punto de interconexión)

SCU *

Fast Currient answer Connected and Disconnected (ms)

© Siemens AG 2018 Page 11

High Density Energy Storage (space and weigh)

January 2018

siemens.com/energy-management